Amanda's Maid offers professional post-construction cleaning for homes and offices in Charlotte and surrounding areas. After a renovation or new build, our team will handle everything. Our team specializes in delivering high-quality cleaning services tailored to post-construction environments, ensuring that each unit is move-in ready with meticulous attention to detail.

Our Three-Phase Cleaning Approach. We divide our post-construction cleaning process into three essential phases to guarantee a spotless finish:

Get a free quote
Amanda's Maid post-construction cleaning in Charlotte, NC
1

Full Clean Part 1

Initial deep cleaning to remove construction dust, debris, and residues.

2

Full Clean Part 2

Detailed cleaning of all surfaces, fixtures, and spaces to prepare the unit for final inspections.

3

Touch Clean

A final polish, focusing on removing any remaining dust and ensuring a pristine, move-in-ready condition.

Ready to help

Free quote

Our local, family-owned and operated cleaning company is fully insured, and all cleaning technicians are professionally trained and background checked. To learn more about our services, reach out to our office and we will assist you with quoting, scheduling, requests, and any other needs.

Get a free quote
Clean satisfaction

Check below the process of a post construction cleaning

Every Deep Cleaning includes our Regular Cleaning, with extra focus on buildup removal and detailed attention to the following:

Rough clean phase of post-construction cleaning in Charlotte, NC
Phase 1

ROUGH CLEAN (Initial Construction Cleaning)

Recommended Timing: After major construction is completed, but before flooring and painting touch-ups.

  • Remove large debris, construction dust, and waste (drywall, paint, flooring).
  • Sweep and vacuum all surfaces: floors, walls, and ceilings.
  • Dust window sills, baseboards, and door frames.
  • Pre-clean bathrooms and kitchens (remove grout, glue, caulking residues).
  • Prepare space for the next construction stage (e.g., flooring, touch-up painting).
Phase 2

FINAL CLEAN (Deep Cleaning & Detailing)

Recommended Timing: After all installations are complete, before inspections and staging.

  • Deep clean all interior spaces: walls, ceilings, floors, and appliances.
  • Thoroughly clean kitchens and bathrooms: cabinets, counters, sinks, toilets, showers, fixtures.
  • Vacuum and mop floors using appropriate solutions for each material.
  • Polish mirrors, stainless steel, and glass surfaces.
  • Remove dust from vents, baseboards, and light fixtures.
  • Dispose of leftover packaging materials (cardboard, plastic wrap, films).
Final clean phase of post-construction cleaning in Charlotte, NC
Touch-up clean phase of post-construction cleaning in Charlotte, NC
Phase 3

TOUCH-UP CLEAN (Final Walkthrough & Move-in Ready)

Recommended Timing: 48–72 hours before move-in or final handover.

  • Conduct final walkthrough cleaning to eliminate settled dust or smudges.
  • Inspect corners, edges, and high-touch areas for remaining debris or marks.
  • Wipe down doors, switches, and any overlooked surfaces.
  • Re-vacuum and mop all floors to ensure spotless finish.
  • Final prep for property inspection and resident move-in.